Prepared to meet your coastal requirements.
the name is enough
who we are
I&C Trading Private Limited is based both in Male’ City and the Industrial hub Thilafushi. With a team of over 30 associates, I&C has to date completed over 10 major projects within its first year. I&C is one of the fastest upcoming logistics and heavy machinery rental and supply chain in this market.
I&C has also expanded its operations in to supplying the much-needed spare parts and rental services to the sectors in need. I&C is proud be the only company to provide logistical fulfillment services from sourcing parts to last-mile delivery to any site within the Maldives. I&C believes in partner driven strategies and thus have established partnerships in ensuring that our customers get the best service within the industry.
our services
As our services include a turnkey approach, we have established our Operation Hubs both in Male’ City and the Industrial Hub, Thilafushi.
our fleet
we strive to deliver excellence
Equipped with a rugged fleet I&C has come up with a deep strategy approach
our
fleet &
workshop
Equipped with a rugged fleet I&C has come up with a deep strategy approach in partnership with different industry stakeholders to supply and provide a turnkey solution for both Government and Private sector-oriented projects nationwide. of heavy load machineries I&C has a dynamic team of Engineers, Operation Technicians and other Industry Specialists.
We have acquired a 93.9FT Landing Craft of 150 Tons equipped with a 2 x 405HP Engines and has been in commission starting August 2022. We have also acquired a Spud Barge 100FTx30FT to our fleet and will be in commission by end of June 2023. We also have 45FT Tugboat with double screw, twin engines, in-built with state-of-the-art services for navigation. We are well equipped with heavy load machineries with Excavators ranging from 200, 330, 350 to 750. Furthermore, we also have multi tonnage dump trucks, cranes and lorry’s in operation. Currently we rent out our gensets to various resorts and offshore projects on request.
Our workshop at K. Thilafushi is fully equipped to service, repair, and commission heavy-load machineries with industry mechanical professionals
REAL-
TIME TRACKING
All our vessels are equipped with real-time tracking devices
marine fleet
in action
our
new edition
THE NEW LCT 350
We have acquired a new 124FT Landing Craft of a loading capacity of 350 Tons equipped with a 2 x 405HP Engines. The 350T LCT is now in commission and has a professional and a dedicated crew of 5.
/portfolio
waste disposal
services
projects
01
RAA. BODU FARU FINOLHU
Local:
Raa Atoll
Duration:
01 Year
Status:
Completed
Scope of Work
Loading & Unloading of Rock Boulders, Reclamation & Revetment
02
MALE' RING ROAD BITUMEN FLOORING
Local:
Male' City
Duration
60 Days
Status:
Completed
Scope of Work
Placement of Bitumen Flooring in the Ring Road of the capital city Male' was one of the largest projects that was carried out by I&C
03
blue lagoon reclamation
Local:
Kaafu Atoll
Duration:
01 Year
Status:
Completed
Description:
The project took place in the beautiful lagoons of Emboodhoo Falhu, now known as the famous CROSSROADS unveiling Hard Rock and Hilton's newest additions. Blue Lagoon was the last and the final lagoon to be reclaimed in the chain of lagoons.
04
KEREDHDHOO HARBOR DEVELOPMENT
Local:
Gaafu Alif Atoll
Duration:
08 Months
Status:
Completed
Description:
Located in Gaafu Alifu Atoll Keredhdhoo is an uninhabited resort development island. Apart from the Jetty Development we also carried out Reclamation and Piling works between Keredhdhoo and Maamendhoo.
05
KUDA VILLINGILLI SPUN PILES PROJECT
Local:
North Male' Atoll
Area:
06 Months
Status:
Completed
Description:
We carried out the placement of Spun Piles for the development of Water Villas. These Water Villas developed in this 5-star Resort is one of the prime Maldivian retreats.
06
loama resort beach development
Local:
Raa Atoll
Duration:
03 Months
Status:
Completed
Description:
With 13,500CBM of Sand we carried out Beach Nourishment and Beach Scaping project at Loama Resort Maldives at Maamingili located in Raa Atoll which boasts 38 Beach Villas
07
maniya faru resort
Local:
Baa Atoll
Duration:
06 Months
Status:
Completed
Description:
For the development of Water Villa's, built from natural materials, we carried out the project to place Spun Piles. The resort was scheduled to open in 2021.
08
ANANTARA DHIGU OUT-WALL BLOCKS
Local:
South Male' Atoll
Area:
10 Days
Status:
Completed
Description:
We carried out the placement of 48 Out-wall Blocks in this premium island resort. The work was completed within 10 days by a team professionals working in projects based in the sea.
09
cheval blanc randheli jetty project
Local:
Noonu Atoll
Area:
10 Days
Status:
Completed
Description:
We carried out the Demolition of Cheval Blanc Randheli Jetty and Clearance of Rubble & Debris to K. Thilafushi Dump Site.
10
undocking largest safari
Local:
Innamaadhioo
Status:
Completed
Description:
We provided our services to Undock the Largest Built Safari in the Maldives. The Safari was constructed i the island of Innamaadhoo.
11
fenaka corp. generator transport
Local:
04 Atolls
Duration:
01 Month
Status:
Completed
Description:
We carried out the Logistics and Delivery Operations of Generators to 04 different Atolls as a Sub-contractor for Fenaka Corporation Limited.
12
rdc, aggregate & sand project
Local:
Greater Male'
Duration:
01 Year
Status:
Completed
Description:
With a signed contract for 01 year, we carried out Loading & Unloading of Aggregate to Jumbo Bags for Road Development Corporation, RDC
13
sto jetty project
Local:
K. Thilafushi
Duration:
04 Months
Status:
Completed
Description:
Our teams carried out Sheet Piling, Concrete Capping & Other Concrete Works at State Trading Organization Plc, STO Distribution Centre Jetty Area at K. Thilafushi
14
Development of K. Thilafushi T-Jetty
Local:
K. Thilafushi
Duration:
06 Months
Status:
Completed
Description:
Demolition, Sheet Piling & Concrete Works for the Development of K. Thilafushi T-Jetty.
15
Development of K. Thilafushi, HDC
Local:
K. Thilafushi
Duration:
06 Months
Status:
Completed
Description:
Revetment between Lafarge Cement & T-Jetty is currently ongoing for the Development of K. Thilafushi HDC Site.
16
BEACH DEVELOPMENT AT
K. FIHALHOHI ISLAND RESORT
Local:
K. Fihalhohi Island Resort
Duration:
20 Days
Status:
Completed
Description:
Completed the beach development project where the scope of work includes Sand Filing, 70Mtr Revetment & 2 x 17Mtr Break Water at K. Fihalhohi Island Resort
17
BEACH DEVELOPMENT AT
B. soneva fushi
Local:
K. Soneva Fushi
Duration:
40 Days
Status:
Completed
Description:
Completed the beach development and nourishment project where the scope of work includes 7500CBM of Sand Filing, and Leveling.
18
development of training grounds of maldives correctional service, (ICOAST)
at k. maafushi jail
Local:
K. Maafushi Jail
Duration:
13 Days
Status:
Completed
Description:
Completed sand filling and leveling of a 100,000SQFT Training Ground for Maldives Correctional Service
19
LANDSCAPING PROJECT AT
R. KUDAKURATHU.
Local:
R. Kudakurathu
Duration:
90 Days
Status:
Completed
Description:
Uprooting, Rootballing Trees & Palms from N. Maafaru, Transport to R. Kudakurathu. Unloading and Planting at R. Kudakurathu
20
four seasons kuda huraa
Removal of Seagrass
from Main Beach
Local:
Four Seasons Kuda Huraa
Duration:
15 Days
Status:
Completed
Description:
Removed Seagrass from the Main Beach Area
Contact Us
I&C Trading Private Limited
Kulunuvehi, SHE Building, Sixth Floor, Apt 6D
Buruzu Magu, Male', Rep. of Maldives
admin@inctrading.mv
www.inctrading.mv
Hotline: +960 777 1823
i&c