Prepared to meet your coastal requirements.

the name is enough

who we are


I&C Trading Private Limited is based both in Male’ City and the Industrial hub Thilafushi. With a team of over 30 associates, I&C has to date completed over 10 major projects within its first year. I&C is one of the fastest upcoming logistics and heavy machinery rental and supply chain in this market.


I&C has also expanded its operations in to supplying the much-needed spare parts and rental services to the sectors in need. I&C is proud be the only company to provide logistical fulfillment services from sourcing parts to last-mile delivery to any site within the Maldives. I&C believes in partner driven strategies and thus have established partnerships in ensuring that our customers get the best service within the industry.


our services

As our services include a turnkey approach, we have established our Operation Hubs both in Male’ City and the Industrial Hub, Thilafushi.

  • Supply of Heavy Load Machineries & Vehicles
  • Rental Services of Heavy Load Vehicles & Machineries
  • Supply of Spare-parts
  • Service & Maintenance of Vehicles & Machineries
  • Dredging & Reclamation
  • Excavating & Back-filing
  • Beach Scaping & Development
  • Transportation Services
  • RO Services
  • Salvage Services
  • Turnkey solutions for Resorts & Local Tourism Islands
  • Loading & Unloading Services
  • Landing Craft (LTC) & Tugboat Logistic Services
  • Landscaping

our fleet

White Punctuation Mark Vector

we strive to deliver excellence

Equipped with a rugged fleet I&C has come up with a deep strategy approach

our

fleet &

workshop

Equipped with a rugged fleet I&C has come up with a deep strategy approach in partnership with different industry stakeholders to supply and provide a turnkey solution for both Government and Private sector-oriented projects nationwide. of heavy load machineries I&C has a dynamic team of Engineers, Operation Technicians and other Industry Specialists.


We have acquired a 93.9FT Landing Craft of 150 Tons equipped with a 2 x 405HP Engines and has been in commission starting August 2022. We have also acquired a Spud Barge 100FTx30FT to our fleet and will be in commission by end of June 2023. We also have 45FT Tugboat with double screw, twin engines, in-built with state-of-the-art services for navigation. We are well equipped with heavy load machineries with Excavators ranging from 200, 330, 350 to 750. Furthermore, we also have multi tonnage dump trucks, cranes and lorry’s in operation. Currently we rent out our gensets to various resorts and offshore projects on request.


Our workshop at K. Thilafushi is fully equipped to service, repair, and commission heavy-load machineries with industry mechanical professionals

Location Map Icon

REAL-

TIME TRACKING

All our vessels are equipped with real-time tracking devices

marine fleet

in action

our

new edition

THE NEW LCT 350

We have acquired a new 124FT Landing Craft of a loading capacity of 350 Tons equipped with a 2 x 405HP Engines. The 350T LCT is now in commission and has a professional and a dedicated crew of 5.

/portfolio

waste disposal

services

projects

01

RAA. BODU FARU FINOLHU

Local:

Raa Atoll

Duration:

01 Year

Status:

Completed

Scope of Work

Loading & Unloading of Rock Boulders, Reclamation & Revetment

02

MALE' RING ROAD BITUMEN FLOORING

Local:

Male' City

Duration

60 Days

Status:

Completed

Scope of Work

Placement of Bitumen Flooring in the Ring Road of the capital city Male' was one of the largest projects that was carried out by I&C

03

blue lagoon reclamation

Local:

Kaafu Atoll

Duration:

01 Year

Status:

Completed

Description:

The project took place in the beautiful lagoons of Emboodhoo Falhu, now known as the famous CROSSROADS unveiling Hard Rock and Hilton's newest additions. Blue Lagoon was the last and the final lagoon to be reclaimed in the chain of lagoons.

04

KEREDHDHOO HARBOR DEVELOPMENT

Local:

Gaafu Alif Atoll

Duration:

08 Months

Status:

Completed

Description:

Located in Gaafu Alifu Atoll Keredhdhoo is an uninhabited resort development island. Apart from the Jetty Development we also carried out Reclamation and Piling works between Keredhdhoo and Maamendhoo.

05

KUDA VILLINGILLI SPUN PILES PROJECT

Local:

North Male' Atoll

Area:

06 Months

Status:

Completed

Description:

We carried out the placement of Spun Piles for the development of Water Villas. These Water Villas developed in this 5-star Resort is one of the prime Maldivian retreats.

06

loama resort beach development

Local:

Raa Atoll

Duration:

03 Months

Status:

Completed

Description:

With 13,500CBM of Sand we carried out Beach Nourishment and Beach Scaping project at Loama Resort Maldives at Maamingili located in Raa Atoll which boasts 38 Beach Villas

07

maniya faru resort

Local:

Baa Atoll

Duration:

06 Months

Status:

Completed

Description:

For the development of Water Villa's, built from natural materials, we carried out the project to place Spun Piles. The resort was scheduled to open in 2021.

08

ANANTARA DHIGU OUT-WALL BLOCKS

Local:

South Male' Atoll

Area:

10 Days

Status:

Completed

Description:

We carried out the placement of 48 Out-wall Blocks in this premium island resort. The work was completed within 10 days by a team professionals working in projects based in the sea.

09

cheval blanc randheli jetty project

Local:

Noonu Atoll

Area:

10 Days

Status:

Completed

Description:

We carried out the Demolition of Cheval Blanc Randheli Jetty and Clearance of Rubble & Debris to K. Thilafushi Dump Site.

10

undocking largest safari

Local:

Innamaadhioo

Status:

Completed

Description:

We provided our services to Undock the Largest Built Safari in the Maldives. The Safari was constructed i the island of Innamaadhoo.

11

fenaka corp. generator transport

Local:

04 Atolls

Duration:

01 Month

Status:

Completed

Description:

We carried out the Logistics and Delivery Operations of Generators to 04 different Atolls as a Sub-contractor for Fenaka Corporation Limited.

12

rdc, aggregate & sand project

Local:

Greater Male'

Duration:

01 Year

Status:

Completed

Description:

With a signed contract for 01 year, we carried out Loading & Unloading of Aggregate to Jumbo Bags for Road Development Corporation, RDC

13

sto jetty project

Local:

K. Thilafushi

Duration:

04 Months

Status:

Completed

Description:

Our teams carried out Sheet Piling, Concrete Capping & Other Concrete Works at State Trading Organization Plc, STO Distribution Centre Jetty Area at K. Thilafushi


14

Development of K. Thilafushi T-Jetty

Local:

K. Thilafushi

Duration:

06 Months

Status:

Completed

Description:

Demolition, Sheet Piling & Concrete Works for the Development of K. Thilafushi T-Jetty.


15

Development of K. Thilafushi, HDC

Local:

K. Thilafushi

Duration:

06 Months

Status:

Completed

Description:

Revetment between Lafarge Cement & T-Jetty is currently ongoing for the Development of K. Thilafushi HDC Site.

16

BEACH DEVELOPMENT AT

K. FIHALHOHI ISLAND RESORT

Local:

K. Fihalhohi Island Resort

Duration:

20 Days

Status:

Completed

Description:

Completed the beach development project where the scope of work includes Sand Filing, 70Mtr Revetment & 2 x 17Mtr Break Water at K. Fihalhohi Island Resort

17

BEACH DEVELOPMENT AT

B. soneva fushi

Local:

K. Soneva Fushi

Duration:

40 Days

Status:

Completed

Description:

Completed the beach development and nourishment project where the scope of work includes 7500CBM of Sand Filing, and Leveling.

18

development of training grounds of maldives correctional service, (ICOAST)

at k. maafushi jail

Local:

K. Maafushi Jail

Duration:

13 Days

Status:

Completed

Description:

Completed sand filling and leveling of a 100,000SQFT Training Ground for Maldives Correctional Service

19

LANDSCAPING PROJECT AT

R. KUDAKURATHU.

Local:

R. Kudakurathu

Duration:

90 Days

Status:

Completed

Description:

Uprooting, Rootballing Trees & Palms from N. Maafaru, Transport to R. Kudakurathu. Unloading and Planting at R. Kudakurathu

20

four seasons kuda huraa

Removal of Seagrass

from Main Beach

Local:

Four Seasons Kuda Huraa

Duration:

15 Days

Status:

Completed

Description:

Removed Seagrass from the Main Beach Area

Contact Us

I&C Trading Private Limited

Kulunuvehi, SHE Building, Sixth Floor, Apt 6D

Buruzu Magu, Male', Rep. of Maldives

admin@inctrading.mv

www.inctrading.mv

Hotline: +960 777 1823

i&c